woshiren
Newcomer
Issue: Just after paying the 5,000g for JojaMart Membership(even though I never paid the 25,000g to repair it), Joja Community Development Form shows the bridge construction as "complete," but the bridge remains unrepaired in-game and I can no longer pay to fix it. I did not use craft room bundles from the community center and only chose Joja.
Version: v1.6.15 build 24356
Details: Using a keyboard, online multiplayer mode, Chinese language settings, no mods used.
Save files: [Attached below]
Note: I used a translator for this message. Please excuse any language issues.
问题:交纳5000g会员金后清单上显示桥梁建造已经完成,并未缴纳25000g,但是实际上完全没有修复,也不能再点清单交钱进行修复,没有用过社区中心进行修复,只玩了joja流
版本号:v.1.6.15 build 24356
使用键盘,在线多人联机,中文,没有使用mod
save files如下
Version: v1.6.15 build 24356
Details: Using a keyboard, online multiplayer mode, Chinese language settings, no mods used.
Save files: [Attached below]
Note: I used a translator for this message. Please excuse any language issues.
问题:交纳5000g会员金后清单上显示桥梁建造已经完成,并未缴纳25000g,但是实际上完全没有修复,也不能再点清单交钱进行修复,没有用过社区中心进行修复,只玩了joja流
版本号:v.1.6.15 build 24356
使用键盘,在线多人联机,中文,没有使用mod
save files如下
Attachments
-
179.9 KB Views: 11
-
72.7 KB Views: 10
-
367.7 KB Views: 5