I think this makes perfect sense! Seconded!I think it would be more general not to skip the upgrade than to not order it. So it does not matter if you upgrade 1-2-3-4 or 1-2-4-3.
This way everybody can choose to take the "family-path" or the "craftsman-path" first.
That would allow us to enjoy the coziness of the smaller house without sacrificing the basement, so that's a solution that works for me.I think it would be more general not to skip the upgrade than to not order it. So it does not matter if you upgrade 1-2-3-4 or 1-2-4-3.
This way everybody can choose to take the "family-path" or the "craftsman-path" first.